Modelling and simulating time use of site workers with 4D BM
Modelling and simulating time use of site workers with 4D BM
Samenvatting
from the paper: "This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result."
Organisatie | Hogeschool Utrecht |
Afdeling | Kenniscentrum Gezond en Duurzaam Leven |
Lectoraat | Building Future Cities |
Gepubliceerd in | Proc. 26th Annual Conference of the International. Group for Lean Construction (IGLC), González, V.A. (ed.), |
Datum | 2018-07-16 |
Type | Conferentiebijdrage |
Taal | Engels |